This is the preview version of the Wisconsin State Legislature site.
Please see http://docs.legis.wisconsin.gov for the production version.
Register April 2013 No. 688
Chapter NR 255
BATTERY MANUFACTURING
Subchapter I — General Provisions
NR 255.01   Purpose.
NR 255.015   Applicability.
NR 255.02   General definitions.
NR 255.03   Monitoring and reporting requirements.
NR 255.04   Compliance date for PSES.
Subchapter II — Cadmium Subcategory
NR 255.10   Applicability; description of the cadmium subcategory.
NR 255.11   Effluent limitations representing the degree of effluent reduction attainable by the application of the best practicable control technology currently available.
NR 255.12   Effluent limitations representing the degree of effluent reduction attainable by the application of the best available technology economically achievable.
NR 255.13   New source performance standards.
NR 255.14   Pretreatment standards for existing sources.
NR 255.15   Pretreatment standards for new sources.
Subchapter III — Calcium Subcategory
NR 255.20   Applicability; description of the calcium subcategory.
NR 255.23   New source performance standards.
NR 255.25   Pretreatment standards for new sources.
Subchapter IV — Lead Subcategory
NR 255.30   Applicability; description of the lead subcategory.
NR 255.31   Effluent limitations representing the degree of effluent reduction attainable by the application of the best practicable control technology currently available.
NR 255.32   Effluent limitations representing the degree of effluent reduction attainable by the application of the best available technology economically achievable.
NR 255.33   New source performance standards.
NR 255.34   Pretreatment standards for existing sources.
NR 255.35   Pretreatment standards for new sources.
Subchapter V — Leclanche Subcategory
NR 255.40   Applicability; description of the Leclanche subcategory.
NR 255.43   New source performance standards.
NR 255.44   Pretreatment standards for existing sources.
NR 255.45   Pretreatment standards for new sources.
Subchapter VI — Lithium Subcategory
NR 255.50   Applicability; description of the lithium subcategory.
NR 255.53   New source performance standards.
NR 255.55   Pretreatment standards for new sources.
Subchapter VII — Magnesium Subcategory
NR 255.60   Applicability; description of the magnesium subcategory.
NR 255.63   New source performance standards.
NR 255.64   Pretreatment standards for existing sources.
NR 255.65   Pretreatment standards for new sources.
Subchapter VIII — Zinc Subcategory
NR 255.70   Applicability; description of the zinc subcategory.
NR 255.71   Effluent limitations representing the degree of effluent reduction attainable by the application of the best practicable control technology currently available.
NR 255.72   Effluent limitations representing the degree of effluent reduction attainable by the application of the best available technology economically achievable.
NR 255.73   New source performance standards.
NR 255.74   Pretreatment standards for existing sources.
NR 255.75   Pretreatment standards for new sources.
NR 255.80   Cross-references.
subch. I of ch. NR 255 Subchapter I — General Provisions
NR 255.01 NR 255.01Purpose. The purpose of this chapter is to establish effluent limitations, standards of performance, and pretreatment standards for discharges of process wastes from the battery manufacturing category of point sources and its subcategories.
NR 255.01 History History: Cr. Register, November, 1987, No. 383, eff. 12-1-87.
NR 255.015 NR 255.015Applicability. This chapter applies to any battery manufacturing plant that discharges or may discharge a pollutant to waters of the state or that introduces pollutants into a publicly owned treatment works. Battery manufacturing operations subject to regulation under this chapter are not subject to regulation under chs. NR 260 and 261.
NR 255.015 History History: Cr. Register, November, 1987, No. 383, eff. 12-1-87.
NR 255.02 NR 255.02General definitions. In addition to the definitions set forth in ch. NR 205 and s. NR 211.03, the following definitions apply to this chapter:
NR 255.02(1) (1) “Ancillary operations" means all of the operations specific to battery manufacturing and not included specifically within anode or cathode manufacture. Ancillary operations are primarily associated with battery assembly and chemical production of anode or cathode active materials.
NR 255.02(2) (2) “Battery" means a modular electric power source where part or all of the fuel is contained within the unit and electric power is generated directly from a chemical reaction rather than indirectly through a heat cycle engine. In this chapter, there is no differentiation between a single cell and a battery.
NR 255.02(3) (3) “Battery manufacturing operations" means all of the specific processes used to produce a battery including the manufacture of anodes and cathodes and associated ancillary operations. These manufacturing operations are excluded from regulation under any other point source category.
Loading...
Loading...
Published under s. 35.93, Stats. Updated on the first day of each month. Entire code is always current. The Register date on each page is the date the chapter was last published.